Production launch checklist
A practical gate before connecting customer traffic.
7 min readIdentity and access
- Verify every human account.
- Enable authenticator-based two-factor authentication for privileged members.
- Use the least-privileged organization role.
- Create separate application database roles instead of sharing owner credentials.
Data safety
- Confirm automated backups are healthy.
- Create and validate a restore point.
- Run a recovery drill and record the result.
- Test export and deletion workflows before customer launch.
Application readiness
- Require TLS in the connection string.
- Use connection pooling and bounded retry behavior.
- Run migrations with a deployment identity.
- Set storage, connection, and budget alerts.
- Subscribe the operations team to status and incident notifications.
Use the readiness dashboard
Console → Launch readiness evaluates live configuration and operational evidence. A green interface is not a substitute for a real restore, failover, and load exercise; attach those results to your release checklist.
Do not launch on assumptions
A backup is only proven when it has been restored and the restored data has been checked.
Something unclear or wrong? Tell support